With the popularity of organic fertilizer, the use of organic fertilizer production equipment is also greatly increased, which makes the demand of organic fertilizer equipment increase year by year. Therefore, the standard operation of organic fertilizer equipment has also become the focus of attention. The following is a brief introduction to the matters needing attention when the organic fertilizer manufacturing process is newly built and the project is put into use
1. Before the start-up of organic fertilizer production equipment
Since all parts of the new equipment have not been run in, it is necessary to heat up the equipment for the first time, which generally requires 40-50 minutes. For specific operation, firstly raise the temperature to pull the motor V-belt by hand until it is free, and pull the motor continuously for 8-10 times according to the normal operation option. Then keep heating for about 10 minutes.
2. Temperature control after startup
Before starting the machine, we have carried out preliminary temperature adjustment for the equipment. The material treatment of the organic fertilizer equipment in the production process is determined by the characteristics of the material itself. Therefore, it is necessary to continue heating after starting up, because the normal production needs to continuously supplement heat; different temperatures are adjusted according to different properties of plastics.
3. When the fertilizer manufacturing process works normally
During normal operation, the temperature of the drum granulator should be kept stable, and it should not be high or low. The temperature should be about 200 ℃ near the vent hole until the machine head. At this temperature, most materials can be well processed. For the double roller granulator, it can be granulated at normal temperature, and the main thing is to pay attention to the material moisture during granulation.
4. Shutdown of organic fertilizer manufacturing process
First of all, cut off the power of the host, and the plug (part with wrench) of the machine head must be removed. Preheat separately before the next use. Because organic fertilizer production equipment is heavy-duty machinery, it is necessary to strictly abide by the corresponding operating procedures and production items when operating organic fertilizer granulation equipment to ensure safe and effective production. When installing, pay attention to whether the host is perpendicular to the ground. After installation, first check whether the screws of the machine are loose and whether the air box of the main unit door is fastened. If there is any looseness, please reinforce it to avoid accidents.